Switching staffing software

Replace your ATS without blowing up operations

A switch is a data migration, a payroll parallel run and a retraining project, in that order. Done that way, the agency ends up on one system in weeks: workers in its own app, clients in its own portal, one record from job order to cash.

Front office go-liveATS · worker app · client portal · onboarding
Day 1
Load and configureDays 1 to 5
Recruiters on their own ordersDays 6 to 12
Clients on the portalDays 13 to 18
CutoverDays 19 to 20
Live. New orders in ActivateStaff only.

Why agencies move

What changes on day one after cutover

One place to work

Recruiters, payroll and branch managers stop jumping between a front office, a back office and an app admin. A placement has one screen.

No month-end reconciliation

The invoice and the pay run come from the same approved hours. There is no second system to disagree with.

Workers on an app they use

Jobs filled the night before, because offers go out at 9pm and half the interest arrives after the branch closes.

Clients who serve themselves

Orders, rosters and time approval in the portal. Coordinators handle exceptions instead of every call.

A fractional tech team

Payroll, onboarding, phone and outreach partners connected and kept connected by us. You stop being the integrator.

A platform that moves

One agency saw more than 40 improvements ship in its first six months, most of them asked for by its own team.

Step one

Front office live in 20 days

  1. Days 1 to 5 · Load and configure

    Workers, clients, open orders and rates come across. Branches, pay and bill rules, placement controls and document requirements are set with your team.

  2. Days 6 to 12 · Recruiters on their own orders

    Training happens on your real job orders. Recruiters fill a live order end to end in the first week. The app goes to workers with a text from their recruiter.

  3. Days 13 to 18 · Clients on the portal

    Your top clients get the portal first: roster, time approval, messaging.

  4. Days 19 to 20 · Cutover

    New orders go in ActivateStaff only. The old front office goes read-only.

Front office · 20 days Load, configure Recruiters live Clients on portal Cutover Day 1Day 6Day 13Day 19 What has to be true on day one An export of workers, clients and open orders Pay and bill rates by client and job One owner on your side who can make decisions A list of every tool that touches a placement today What makes it slip: integrations nobody listed

Step two

Back office on a pay-period boundary

Our AI migration tool reads the old system’s exports, maps every field, and flags duplicates, missing documents and inconsistent records before anything is loaded. You see the list and decide what comes across.

Payroll then runs in parallel for a few periods, the same hours through the old provider and through Everee, compared line by line. Cutover happens on a period boundary. Reconciliation takes weeks, not months.

Step three

Integrations scoped first

Payroll is not what makes a migration long. Waiting on a phone system, an outreach tool or a client-site time clock is. We list every tool that touches a placement on day one, decide what the platform replaces and what needs connecting, and only then commit to a date.

  • Replaced: texting, worker app, client portal, scheduling, time collection
  • Embedded: Everee payroll, Onboarded onboarding and I-9
  • Connected: phone, outreach and screening, time clocks, accounting

Mid-contract

If you have time left on your current contract

There are two real options. Running the front office here and the back office there in between is not one of them: it means double entry, reporting gaps and a worse version of the problem you were leaving.

Move everything now

Pay out the term and be on one system this quarter. This wins when the monthly cost of workarounds beats the overlap, which is more common than owners expect.

Go live the day the contract ends

Start so the front office goes live in the last month of the term and payroll cuts over on the first period after it. Until then, Standby keeps a live copy of your data with us, so you are covered if your current system goes down.

Questions owners ask

How long does a full switch take?

Front office in 20 days. Back office on the first clean pay-period boundary after a parallel run, typically a few weeks later. Third-party integrations are what stretch a project, so they are scoped before a date is committed.

Will my recruiters need weeks of training?

No. Recruiters at one multi-state agency needed one day of training, against two weeks on their previous system. Training happens on your own open orders.

What happens to our bad data?

It gets found before it lands. The migration tool flags duplicates, missing documents and inconsistent records, and you choose what comes across.

Can we keep our payroll provider?

Yes. Larger agencies can keep their provider and receive a payroll file from approved time. Most agencies move to Everee, embedded in the platform, because it keeps one record through to the pay run.

Is there a good reason not to switch?

If your renewal is far out and nothing is broken, wait for the notice window and put Standby in place meanwhile. If you don’t believe workers will use an app or clients a portal, we are the wrong platform.